Download Print this page

IAC INDUSTRIES SMS S1 SMART MOBILE STATION Assembly Instructions Manual page 24

Advertisement

SMS WORKSURFACE INSTALLATION
Install 5/16-18 x .75 square head bolts
(item H), 5/16 flat washer (item D), and
5/16-18 hex head keps nuts (item J) to
the top support brackets items (4 and 5)
as shown at left .
Do not tighten this hardware.
Make small pencil marks on the uprights
desired working height. Install the top
support brackets by installing the square
head bolts into the milled slots in the front
nut channels of the upright. Gently slide
the top support brackets to the pencil
marks and tighten the hex head keps nuts
to hold them in place. Do not tighten this
hardware to more than 10 foot lbs of
torque. Doing so will cause scoring to the
aluminum of the upright.
Install the handles (item M) to
the bottom of the worksurface
(item 2) with 1/4-20 x .625
phillips head screws and 1/4
flat washers (items D and E).
Place the worksurface on the top support brackets so that the cut out fits around the upright. Line up
the threaded inserts in the bottom of the worksurface with the holes in the top supports and secure
with the 1/4-20 x .625 phillips head screws and flat washers.
6
MILLED OUT SLOT

Advertisement

loading

Related Products for IAC INDUSTRIES SMS S1 SMART MOBILE STATION