Download Print this page

IAC INDUSTRIES SMS S1 SMART MOBILE STATION Assembly Instructions Manual page 39

Advertisement

SMS S4 FPD Swing Arm Assembly
Fig. A
See Fig A above: Uses Hardware Kit HWR531.
Install 5/16-18 x .75 square head bolts (item T),
1/4 flat washer (item V), and 5/16-18 hex head
Acorn nuts (item W) to the D4 Swing Arm Mtg Plt
Assy (item 11). Do not tighten this hardware.
Install the
heads of the square bolts into a milled cut out in the
rear slot of the upright . Adjust the
Mtg Plt Sub-Assy 75#
tighten the Acorn nuts. Do not tighten in excess of
10 ft lbs. as this may damage the Upright Extrusion.
Install the Monitor bracket by installing the
square head bolts (item 2) into the milled slots
in the front nut channels of the upright. Gently
slide the monitor bracket (item 2) to the
desired height and tighten the hex head keps
nuts to hold them in place. Do not tighten this
hardware to more than 10 foot lbs of torque.
Doing so will cause scoring to the aluminum of
the upright.
See Fig B above: If your monitor has a 100MM
mounting hole pattern (about 3.94") attach the
adapter plate (item Z) to the pivot (item 9)
using the #10 hex nuts and washers (items X
and Y).
Place a plastic washer on the pin of the Swing
Arm (item 10) and the pin of the Pivot (item 9).
Slide the pin of the Swing Arm (item 10) into
the bushing of the Mounting Plate (item 11) on
the upright and then slide the pin of the Pivot
into the bushing of the Swing Arm.
10
Fig. B
D4,Swing Arm Mtg Plt Sub-Assy 75#
D4,Swing Arm
to the desired height and
the

Advertisement

loading

Related Products for IAC INDUSTRIES SMS S1 SMART MOBILE STATION