7 - Operation
D
isplay access and settings
After the commissioning of the inverter, it is possible/necessary to set the
configuration of the inverter by accessing the "Account Settings" from
the display. The following are the main adjustable parameters (see the
section dedicated to the "Menu descriptions")
• Address RS485: settings required in the case of system monitoring
using the RS485 board
• Vstart: setting required in the case it is requested by the configuration
during the system requirement phase ("Vstart" parameter)
• MPPT scan: allows you to carry out a search for the maximum power
point with sensitivity and adjustable time intervals ("MPP" parameter).
• Analogue inputs setting (where present): allows you to set the pa-
rameters of the analogue sensors connected as the input ("Analogue
Inputs").
• Input Strings (where present): setting necessary to carry out checks
on the status of the fuses and on the current imbalance of the strings
present in the input ("Fuse control" parameters).
• Reactive power input setting (where present): setting necessary to
manage the reactive power input into the grid in different ways ("Reactive
Power parameter")
• Limitation active power setting (where present): setting necessary
to set a limit on active power output of the inverter ("Power reduction"
parameter)
- 64 -