Fig S0113
Field wiring diagram
MBE35_50 OPERATION MANUAL 2005_10
11. Attach the field wiring to the proper terminals at the main power board. See
Drawing S0113 below. Make certain that the main circuit breaker is switched
OFF. Connect all electrical wiring exactly as directed in the Connection Diagram.
L1
N
PE
12. Attach the gate arm to the flange using the boom attachment kit (in accessory
box). Please refer to drawing below.
Operation Instructions
L1
N
PE
115 VAC, 60Hz,
5A max.
Ground
12