10
<8> PLACING TOP PANEL
Lower the top panel onto the assembled panels.
1. Gently place the top panel onto the rest of the assembled panels. When
four corners are in place, gently push down the top panel from the outside
corners until it is snugly fit over the rest of panels.
2. Make sure the cable do not get pinched between the panels.
LS-TCED-IC2
LS-TCED-IC3
3. Please screw the ceiling with the side panels with the provided screws
so that the ceiling and the side panels
can connect closely.
<9> THE MAIN POWER CONNECTION ON THE TOP PANEL
1. Connect the heater wires
2. Connect the control panel wires.
3. Check to be sure that all connections to the control box are secure.
11