SR-SERIES
9.0
INSTALLATION
Provide for adequate clearance around air openings into the combustion chamber, clearances from
combustible material, provisions for accessibility and for combustion and ventilating air supply.
9.1
PLANNING
•
Familiarize yourself with the equipment and any accessories that you may require.
•
Locate the area where unit is to be installed.
•
Locate area where any holes might have to be cut for:
a) Venting
b) Any gas piping requirements
•
Make sure that there is no obstruction such as hidden electrical wiring, water lines etc... in the areas
of concern.
•
Locate the thermostat location.
•
Locate a grounded, three prong electrical source.
•
Measure the required amount of the various materials required to do the installation, and have these
materials on site in an organized manner prior to commencement.
WARNING:
Observe minimum clearance to combustibles.
28