Installation; Planning - Calcana SR Series Specifications, Installation, Operation Service And Spare Parts Manual

Table of Contents

Advertisement

SR-SERIES
9.0

INSTALLATION

Provide for adequate clearance around air openings into the combustion chamber, clearances from
combustible material, provisions for accessibility and for combustion and ventilating air supply.
9.1

PLANNING

Familiarize yourself with the equipment and any accessories that you may require.
Locate the area where unit is to be installed.
Locate area where any holes might have to be cut for:
a) Venting
b) Any gas piping requirements
Make sure that there is no obstruction such as hidden electrical wiring, water lines etc... in the areas
of concern.
Locate the thermostat location.
Locate a grounded, three prong electrical source.
Measure the required amount of the various materials required to do the installation, and have these
materials on site in an organized manner prior to commencement.
WARNING:
Observe minimum clearance to combustibles.
28

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents