Step 3: Installing The Waste Chute - Ecoflo Nature Loo Classic 850 Installation & Maintenance Manual

Table of Contents

Advertisement

Step 3: Installing the Waste Chute

First ensure the pad or ground level on which the 'In-service' chamber will reside is at its final
level beneath the toilet room.
Waste Chute Flange
1
2
3
4
Page 8
IMNL-008-24.04.2020
© Ecoflo Wastewater Management Pty Ltd

Advertisement

Table of Contents
loading

Table of Contents