Summary of Contents for Image Engineering iQ-Align XL
Page 1
XL for CAL3-XL & LE7 User Manual 12. November 2019 Image Engineering GmbH & Co. KG · Im Gleisdreieck 5 · 50169 Kerpen-Horrem · Germany T +49 2273 99991 - 0 · F +49 2273 99991 -10 · www.image-engineering.com...
Page 2
Commissioning ......................4 2.2.1 Setup instructions for CAL3-XL / LE7 ..............4 HARDWARE OPERATING INSTRUCTIONS ..............5 Camera positioning ....................5 ADDITIONAL INFORMATION ..................5 Disposal instructions ....................5 TECHNICAL DATA SHEET .................... 5 Image Engineering iQ-Align XL Seite 2 von 5...
Page 3
1.3 Foreseeable misuse 1.3.1 Stuck joints If the arm moves only when using a lot of force, try to further loosen the locking wheel or check the joints for dirt or debris. Image Engineering iQ-Align XL Seite 3 von 5...
XL. To attach the iQ-Align XL to the CAL3-XL / LE7 you now only need to slightly lift the front feet up, slide the locking rings of the iQ-Align XL under them and carefully lower the feet into them.
HARDWARE OPERATING INSTRUCTIONS 3.1 Camera positioning Mount the DUT on the mounting bracket of the iQ-Align XL. You can use the attached ¼” screw or any other screw up to a diameter of 6.5 mm. To position the DUT, loosen the locking wheel and manually guide the DUT to the desired position.