Optional Step 6: Install A Power Supply Unit - NETGEAR M4300 Intelligent Edge Series Hardware Installation Manual

Fully managed stackable switches
Table of Contents

Advertisement

M4300 Intelligent Edge Series Fully Managed Stackable Switches
The following figure shows model M4300-48X. However, you install SFP transceiver
modules in the SFP+ ports of the 1G models with 10G uplinks or the 10G models
with RJ45/SFP+ combo ports in the same manner.

Optional Step 6: Install a power supply unit

The supported power supply unit (PSU) or PSUs depend on the switch model. For more
information, see Power supply units on page 44.
The PSU for model M4300-16X might be in the product package, in which case you
must install it in the power module bay.
The following full-width models provide a second power module bay in which you can
install an optional second PSU:
• M4300-24X24F, M4300-48X, and M4300-48XF
• M4300-28G and M4300-28G-POE+
• M4300-52G and M4300-52G-POE+
For these models, the PSU that is shipped with the product is installed in the power
supply bay on the left, which is marked PSU1. You can install the second PSU in the
power supply bay on the right, which is marked PSU2. The switch can continue to operate
while you install a second PSU.
To install a PSU:
1. Pull out the cover plate from the power module bay. For models with two power
modules bays, the PSU that is shipped with the product is installed in the left power
supply bay. The second power supply bay is the one on the right.
Installation