The following table shows all the possible status of "WLAN/LAN" LED on the LED panel (08) according to the
operating status of the wireless or ethernet communication lines.
Led Status
Operating state
Blue:
Wireless not configured or/and ethernet cable not connected.
Blue:
Scanning for available wireless networks.
Blue:
Trying to connect to a wireless network.
Blue:
Wireless or ethernet network is connected to the inverter and IP address is obtained.

13. Commissioning

A
ATTENTION –
Do not place objects of any kind on the inverter during operation! Do not touch the
heat sink while the inverter is operating! Some parts may be very hot and could cause burns.
A
ATTENTION –
Before proceeding with commissioning, make sure you have carried out all the
following checks:
connection and polarity of the DC inputs, and the correct connection of the AC output and earth cables.
3) Check the sealing of the cable glands and installed quick-fit connectors to prevent accidental
disconnections and/or avoid compromising the IP65 environmental protection rating.
A
ATTENTION –
This inverter can be powered both with AC or DC sources. In case of DC source is
used, make sure that irradiation is stable and adequate for the inverter commissioning procedure to
be completed.
A
ATTENTION –
At the first activation of the inverter the firmware version could syncronized between
power module and wiring box. During this phase the LEDs "Power" "Alarm" and "GFI" blinks together
every 1 second. This process is absolutely normal and must be completed without interruption. A
switch-off of the system during this process could cause serious damage to the inverter.
Commissioning could be carried out in two different ways:
• Via ABB Installer for Solar Inverters APP (mobile APP for commissioning a single inverter as well as a multi-
inverter solar plant)
• Via Web UI (Integrated Web User Interface enabling setting parameters and performing commissioning of
a single inverter).
D
NOTE –
ABB Installer for Solar Inverters APP is the recommended method to commission the
inverters.
E
READ THE MANUAL –
operation of the system and to ensure the inverter remains fully functional, you are advised to check
for any firmware updates in the download area of the website www.abb.com/solarinverters or at
https://registration.abbsolarinverters.com (instructions for registering on the website and updating
the firmware are given on the user manual).
1) Ensure that the front door have been correctly closed.
To address any problems that may occur during the initial stages of
37
2) Check the correct