CHD Elektroservis SY2-KBD Installation Manual page 9

For yamaha sy-2/sy-1 keyboard control
Table of Contents

Advertisement

SY2
SY2
SY2- - - - KBD
SY2
KBD
KBD
KBD
Figure 2.7.3
Figure 2.7.3
Figure 2.7.3
Figure 2.7.3
c) Isolate the connection with the insulation tube and heat it (with a hot-flue pistol for example) until it shrinks
tightly to the cables.
d) Solder red wire Nr. 1 "IN" of the interface cable to the soldering pad where the blue wire was connected
previously (fig. 2.7.5 and fig. 4-2).
e) Solder black wire Nr. 4 "GND" of the interface cable to soldering pad of the instrument's keyboard – to pad
where a black wire and shielding of the blue cable are already soldered (fig. 2.7.5 and fig. 4-2).
f) Solder green wire Nr. 3 "REF" of the interface cable to lug on the instrument's keyboard where a green wire is
already soldered (fig. 2.7.6 and fig. 4-2).
Figure 2.7.5
Figure 2.7.5
Figure 2.7.5
Figure 2.7.5
No part of this publication may be reproduced in any form without the written permission of CHD Elektroservis.
Installation Manual
Installation Manual
Installation Manual
Installation Manual
Copyright © 2019 CHD Elektroservis. All rights reserved.
Figure. 2.7.2
Figure. 2.7.2
Figure. 2.7.2
Figure. 2.7.2
9 9 9 9
Yamaha SY- - - - 2 (SY
Yamaha SY
2 (SY- - - - 1) MIDI Interface
1) MIDI Interface
Yamaha SY
Yamaha SY
2 (SY
2 (SY
1) MIDI Interface
1) MIDI Interface
Model 8
Model 8- - - - 439 / v. 1.00
Model 8
Model 8
Figure 2.7.4
Figure 2.7.4
Figure 2.7.4
Figure 2.7.4
Figure 2
Figure 2.7.6
.7.6
Figure 2
Figure 2
.7.6
.7.6
439 / v. 1.00
439 / v. 1.00
439 / v. 1.00

Advertisement

Table of Contents
loading

Table of Contents