New Age Performance Plus 2.0 Series Manual page 18

Table of Contents

Advertisement

Fastening Cabinets on Studded Wall
Use stud finder to locate the studs
1
and mark the wall with a pencil.
Place cabinet tight
3
against the wall.
Drill 4 wall screws and washers
6
through perforated holes into studs.
18
2
Locker, tool and base cabinet: 4 Lag Screws and
4 Wall washers
Corner Wall Cabinet: 6 Lag Screws and 6 Wall
washers
Align cabinet
4
to stud marks.
X4
Gather parts.
Wall Screw
(1/4" x 2.5")
Level cabinet
5
Masonry.
• Follow steps 1 to 6.
• Drill 4 pilot holes through the
perforated strip with hammer
drill & masonry bit.
• Use 4 x ( 2 ¼" x ¼" )Tapcon
Concrete Anchor into wall.
• OR 4 x (#10 x 2" )Screw with
3/16" masonry plug into wall.
• Follow Step 6.
Wall Washer
(1/4")

Advertisement

Table of Contents
loading

Related Products for New Age Performance Plus 2.0 Series

Table of Contents