| www.scintex.com.au Ph: (07) 3137 0135 | Fax: (07) 3041 0541 Pump Manual 12V 75LPM Vane Pump & Vane Pump Station SPEP12V75 & SP12VFS75 SPEP12V75 SP12VFS75 Parts List Part Name Part Name QTY. Screw M8×16 Ring Nozzle Holder Cover Motor Screw M6×20...
Page 3
Other: -Rain / Water proof -Built in strainer and Bypass Valve -Explosion proof permanent magnet motor -Thermal Overload protection Installation & Usage 1) Tightly screw in suction pipe or dip tube (not supplied) into the 1” inlet using teflon tape. Your inlet tube or dip tube should terminate ~3” from the bottom of the drum or container.
Page 4
Weight: 1.8kg Calibration Scintex analogue flow meters are calibrated for use with diesel prior to dispatch. Many factors influence the accuracy of the flow meter including temperature, pressure and viscosity. If the accuracy of the flow meter is compromised then a calibration should be performed. Calibrating flow meters is a normal part of their maintenance and is not an indication of a fault with the unit.
Page 5
Maintenance Before disassembling make sure all fluid is drained from the meter and connecting pipes. Cleaning can be carried out using a soft brush. Be careful not to damage the chamber or disk. Use only original spare parts. A new calibration should be performed after cleaning or disassembly. Flow Meter Disassembly Remove the reset knob by pulling firmly to the side.
Need help?
Do you have a question about the SPEP12V75 and is the answer not in the manual?