Figure 8
Installation guidelines
Example EC-1700 floor tile cutout
Follow these guidelines before installing and setting up the EC-1700
cabinet:
Make sure that the Dell EMC pre-site survey was completed prior
◆
to installation of the rack.
Make sure that the customer site meets all power and
◆
environmental requirements as stated in
Cabinet Specifications."
Installation and Setup
Chapter 2, "EC-1700
Planning overview
33