Mechanical Checks - Aurora PVI-3.0-OUTD-ZZ Installation And Configuration Manual

Photovoltaic inverters
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
INSTALLATION AND CONFIGURATION MANUAL
FOR AURORA PHOTOVOLTAIC INVERTERS
Make sure the cable glands are mounted properly. The cable glands must be adequately locked and prevent any
movement of the cable. Also make sure the cable glands are solidly fi xed to the inverter's chassis.
Make sure that the gasket on the front panel has been correctly mounted. The gasket must completely cover the red line
on the front of the inverter.
Reference Line
Fasten the inverter's front panel by screwing the screws on the panel with the Torx T20 wrench provided.
Warning! To ensure the inverter is waterproof, the front panel screws must be tightened to a torque wrench setting of at
least 1.5 Nm (13.2 in-lbs).

8.2 MECHANICAL CHECKS

Incorrect Mounting
16 -EN
Correct Mounting

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents