Aurora PVI-3.0-OUTD-ZZ Installation And Configuration Manual page 14

Photovoltaic inverters
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
INSTALLATION AND CONFIGURATION MANUAL
FOR AURORA PHOTOVOLTAIC INVERTERS
Should it be necessary to confi gure the channels in parallel, follow the following procedure:
Remove the front panel of the inverter
Using the AWG10/12 cables with insulated female fastons, connect the positive terminal of input 1 to a positive terminal
of input 2 (det. [L]). Repeat the connection for the negative terminals (det. [M]).
[M]
PVI-3.0/3.6/4.2-OUTD
Act on the dip-switch identifi ed by the INPUT MODE printing and put in on the PAR position (det. [N]).
[N]
PVI-3.0/3.6/4.2-OUTD
CONFIGURATION MODES FOR THE CHANNELS IN PARALLEL
Connection in parallel of the input channels.
[M]
PVI-10.0/12.5-OUTD
Confi guration dip-switch for input channel operation mode.
[N]
PVI-5000/6000-OUTD
[L]
[M]
PVI-5000/6000-OUTD
12 -EN
[L]
[N]
PVI-10.0/12.5-OUTD
[L]

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents