IBM Power System E950 9040-MR9 Installing Instruction page 59

Hide thumbs Also See for Power System E950 9040-MR9:
Table of Contents

Advertisement

4. When the login display appears for the ASMI, enter admin for the user ID and password.
5. Change the default password when you are prompted.
6. Press Enter until the server information appears.
You have completed the setup for an ASCII terminal, and have started the ASMI.
7. Continue with "Completing the server setup without using an HMC" on page 49.
Cabling the server to the HMC
The Hardware Management Console (HMC) controls managed systems, including the management of
logical partitions, the creation of a virtual environment, and the use of capacity on demand. Using service
applications, the HMC can also communicate with managed systems to detect, consolidate, and forward
information to IBM service for analysis.
Before you begin
If you have not installed and configured your HMC, do so now. For instructions, see Installation and
configuration tasks (http://www.ibm.com/support/knowledgecenter/POWER9/p9hai/
p9hai_taskflow.htm).
The HMC must be at Version 9 Release 9.2.0, or later. To view the HMC version and release, complete the
following steps:
1. In the navigation area, click Updates.
2. In the work area, view and record the information that appears in the HMC Code Level section,
including the HMC version, release, Service Pack, build level, and base versions.
If you need to update your HMC version and release, see Obtaining and applying machine code updates
for the HMC with an Internet connection (http://www.ibm.com/support/knowledgecenter/POWER9/
p9hai/p9hai_upgrades_enh.htm).
To cable the server to the HMC, complete the following steps:
Procedure
1. If you want to directly attach your HMC to the managed system, connect Ethernet Connector 1 on the
HMC to the HMC1 (T3) port on the managed system.
Installing the IBM Power System E950 (9040-MR9) 45

Advertisement

Table of Contents
loading

Table of Contents