Completing Inventory For Your Server; Attaching The Lift Handles To The Chassis; Screws Needed For Rack Installation - IBM Power System E950 9040-MR9 Installing Instruction

Hide thumbs Also See for Power System E950 9040-MR9:
Table of Contents

Advertisement

• M5 x 12 screw (B)
• M5 x 16 screw (C)
Figure 1. Screws needed for rack installation
You also need one of the following consoles:
• Hardware Management Console (HMC) version 9 release 9.2.0, or later
• Graphics monitor with keyboard and mouse.
• Teletype (TTY) monitor with keyboard

Completing inventory for your server

Use this information to complete inventory for your server.
About this task
To complete the inventory, complete the following steps:
Procedure
1. Verify that you received all the boxes you ordered.
2. Unpack the server components as needed.
3. Complete a parts inventory before you install each server component by following these steps:
a. Locate the inventory list for your server.
b. Ensure that you received all the parts that you ordered.
Note: Your order information is included with your product. You can also obtain the order
information from your marketing representative or the IBM Business Partner.
If you have incorrect, missing, or damaged parts, consult any of the following resources:
• Your IBM reseller.
• IBM Rochester manufacturing automated information line at 1-800-300-8751 (United States
only).
• The Directory of worldwide contacts website http://www.ibm.com/planetwide. Select your
location to view the service and support contact information.

Attaching the lift handles to the chassis

Attach the six lift handles to the chassis so that at least three people can lift the chassis onto the
mounting hardware.
About this task
To attach the lift handles to the chassis, complete the following steps:
Procedure
1. Using both hands, press the latches on each side of the handle (A) using your index fingers.