Project Source F512C021CP Manual page 7

Two-handle bathroom faucet
Table of Contents

Advertisement

ASSEMBLY INSTRUCTIONS
10. Insert lift rod (D) into faucet (A) and, from
below, attach to lift rod strap (G). Tighten
thumbscrew (H) on lift rod strap (G).
11. Adjust ball rod (N) to the down position.
Attach ball rod (N) to lift rod strap (G) with
spring clip (L).
12. Loosen thumbscrew (H) on lift rod strap
(G). Adjust lift rod (D) to down position.
Tighten thumbscrew (H) on lift rod
strap (G).
10
D
A
1
11
12
7
D
2
G
G
L
N
2
D
H
H
H

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents