Connections on the flue gas side

Ø D
Ø10 mm
Fig. 20

Fitting the side, front and back panels

2.
3.
Fig. 21
B 3.9 x 9.5
2x
B 3.9
2x
1. Connect the flue outlet with the shortest possible
run to the chimney and maintain a slight incline.
External Ø, flue outlet: 300 mm
2. Create a test port
7
3. Seal in and thermally insulate the flue pipe (all con-
nections/joints must be gas-tight).
1.
B 3.9 x 9.5
5x
10 mm.