Carrier 38GJQ Series Installation Instructions Manual page 36

Multi-zone ductless system
Hide thumbs Also See for 38GJQ Series:
Table of Contents

Advertisement

Installing the Indoor Unit
1 Preparation
S
Open the front panel, remove the 4 screws and dismount
the front grille while pulling it forward.
Front panel
Remove 4 screws
Fig. 70 – Remove the screws
S
Follow the arrows to disengage the clasps on the front
case to remove it.
S
Follow the procedure below when removing the slit
portions.
For Moldings
S
Remove the pillars. Remove the slit portions on the
bottom frame using nippers.
3)Side
casings
Remove 7 screws
Fig. 71 – Remove the screws
3 tabs
Casing
Front
grille
Remove
front grille
Open the front panel
2)Upper casing
3)Side
casings
Remove the pillar
For Side Piping
Remove the pillars:
(1.) Remove the 7 screws
(2.) Remove the upper casing (2 tabs)
(3.) Remove the left and right casings (2 tabs on each side)
(4.) Remove the slit portions on the bottom frame and casings
using nippers
(5.) Return by following the steps in reverse order (3>2>1).
Fig. 72 – Remove the pillar
Fig. 73 – Remove the pillar
2 Installation
S
Secure using 6 screws for floor installations. Do not
forget to secure to the rear wall.
S
For wall installations, secure the mounting plate using 5
screws and the indoor unit using 4 screws.
36
Casing
Remove the pillar
Bottom frame
Casing
Remove the pillar

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents