Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
•
•
•
2. Shutting down the system
•
3. Opening the boiler door and cleaning cover...................................................................
•
•
•
•
6. Checking all gaskets and packing cords on the flue gas side
•
7. Checking the thermal insulation components on the boiler door................................. 10
•
8. Inserting the turbulators, fitting the boiler door and cleaning cover............................ 10
•
•
9. Checking all connections on the heating water side and the sensor well for leaks
•
•
10. Checking the function of the safety equipment
•
•
•
•
•
•
12. Checking the temperature controller setting if a building management system is
used (DCC system)............................................................................................................ 12
•
•
13. Checking the expansion vessel and system pressure................................................... 12
•
14. Checking the firm seating of electrical plug-in connections and cable grommets
•
15. Checking the thermal insulation
•
•
16. Checking the water quality................................................................................................ 12
•
•
•
18. Checking the mixer for ease of operation and tightness............................................... 13
•
19. Checking the function of the return temperature raising facility (if installed)
•
•
20. Checking the installation room ventilation
•
•
21. Checking the flue pipe for tightness
•
22. Adjusting the burner.......................................................................................................... 13
•
•
24. Operating and service documents................................................................................... 14
Commissioning, inspection, maintenance