Populating the System

CAUTION:
be populated at all times with either a sled or with a sled blank.
CAUTION:
have hard-drive blanks installed.
Install all components into the PowerEdge C8000 server enclosure.
To install a C8220 single-wide compute sled, slide the new sled into the
enclosure until the sled is fully seated and the release latch snaps into
place.
To install a C8220X double-wide compute sled, slide the new sled into
the enclosure until the sled is fully seated and the release latch snaps
into place.
To install a C8000XD storage sled, slide the new sled into the enclosure
until the sled is fully seated and the release tab snaps into place.
To install a power sled, slide the new sled into the enclosure until the sled
is fully seated and the release latch snaps into place.
To install a double-wide sled blank, slide the blank into the enclosure until
it is fully seated and the release latches snap into place.
To install a single-wide sled blank, slide the blank into the enclosure until
it is fully seated and the release latch snaps into place.
14
Getting Started With Your System
To ensure proper operation and cooling, all bays in the enclosure must
To maintain proper system cooling, all empty hard-drive slots must