Download Print this page

Advertisement

Quick Links

34 084
Avensys
.....5
.....1
.....5
GB
D
I
.....2
.....6
NL
GB
.....3
.....7
F
S
.....4
DK .....8
E
95.620.431/ÄM 205474/11.06
.....9
.....13
N
GR
.....10
.....14
CZ
FIN
.....11
.....15
PL
H
.....12
P
.....16
UAE
.....17
BG
.....21
TR
.....18
.....22
SK
EST
.....19
.....23
LV
SLO
.....20
.....24
HR
LT
.....25
RO
.....26
CN
.....27
RUS

Advertisement

loading

Summary of Contents for Gröne Avensys 34 084

  • Page 1 34 084 Avensys ..1 ..5 ..5 ..9 ..13 ..17 ..21 ..25 ..2 ..6 ..10 ..14 ..18 ..22 ..26 ..3 ..7 ..11 ..15 ..19 ..23 ..27 ..4 DK ..8 ..12 ..16 ..20 ..24 95.620.431/ÄM 205474/11.06...
  • Page 2 Table Of Contents Installation Dimensions (mm) Wallplugs Screws Handshower Plug Filter Escutcheons Backplate Valve Body Outlet Nipple Filters Threaded Rings Flexible Hose Flow Limiters Shower Rail...
  • Page 3 Spare Parts...
  • Page 4: Table Of Contents

    Index Table Of Contents ....1 Installation Dimensions ... . 2 Spare Parts Drawing ... . 3 + 4 Spare Parts List.
  • Page 5: Technical Data

    Technical Data Functioning Principle Specification This Avensys mixing valve is a thermostatic • Exposed thermostatic shower mixing mixer with wax cartridge. Turning the shut- valve, concealed or exposed supplies off handle in a counter-clockwise direction • Flow pressure opens the water flow. Turning the tem- - Low pressure 0.1 - 1 bar perature handle in a counter-clockwise...
  • Page 6: Installation

    Installation Exposed Installation In case of exposed installation with supply pipes from above or below rotate inlet The thermostatic shower mixing valve can elbows 90° and connect to 15mm supply be installed in two different ways. The mixing pipes. outlet can be at the bottom for use with a 1.Loosely screw on nuts (A1) with com- handshower or at the top for use with a pression rings (A2), see Fig.
  • Page 7 Installation 6.Mark the holes in the backplate for wall- 9. Slide the escutcheons (H) over the plugs, see Fig. [4]. supply pipes and install filters (J), see Fig. [7]. 7.Drill the holes (6mm) for the wallplugs (F) and fit them into the wall, see Fig. [5]. 10.
  • Page 8 Installation Shower Hose Connection Pipe Connection 1.Close free outlet with plug (K), see 1.Close free outlet with plug (K), see Fig. [9]. Fig. [10]. ° 2.Thread the outlet nipple (L) with the O-ring seal into the valve body outlet. 2.Remove O-ring seal (L1). 3.Insert pipe and tighten outlet nipple (L).
  • Page 9: Adjustment

    Installation Adjustment 6.Check the temperature of the outflowing water with a thermometer, see Fig. [12]. The temperature of the outflowing water is factory set to 43 °C. A temperature adjust- ment is necessary if: • The maximum water temperature measured at the outlet varies from the factory set temperature.
  • Page 10: Maintenance

    Maintenance I. Control Unit 14. Take out O-ring seal (U1). 1. Shut off hot and cold water supply! 15. Take out wax element (V), slider (W) and 2. Turn the shut-off handle counter- spring (X). clockwise to fully open position and Inspect and clean all parts, replace if open water flow.
  • Page 11 Maintenance 7. Unscrew seat 1/8 to 1/6 turn (45° to 15.Push on scale ring (P) with 0 on top and 60°), see Fig. [17]. fix with clip (P1). 16.Reinstall the temperature handle (O) in position hot water. 17. Fix temperature handle with screw (N) and cover with cap (M).
  • Page 12: Trouble Shooting

    Care We want to ensure that you get long-lasting your fitting dull and scratched. As the for- satisfaction and pleasure from your GROHE mulations of commercially available cleaning fitting. Therefore, please read the following agents frequently change, we cannot gua- care instructions because damage to the rantee they will provide the gentle care our surface and underlying material resulting...
  • Page 14: Spare Parts

    Guarantee Guarantee declaration Guarantee performance Our products correspond to the valid tech- A)During the whole guarantee period we will nical and water supply standards as well as correct all functional defects for which we the relevant approvals requirements. We are responsible (limitations see E + F). guarantee them to be free of design and B)It is our option if we correct the defects by production faults at the time of delivery and...