Swegon ADRIATIC VFc Installation Manual
Swegon ADRIATIC VFc Installation Manual

Swegon ADRIATIC VFc Installation Manual

Advertisement

ADRIATIC VFc
Installation – Commissioning – Maintenance

Installation

A
B
C
2 x
L < 19.7"
M8
L < 19.7"
M8
+ 4 x
+ A
B
L
L
m
ft
nom
nom
4
1.2
5
1.5
6
1.8
7
2.1
8
2.4
9
2.7
10
3.0
11
3.3
12
3.6
13
3.9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ADRIATIC VFc and is the answer not in the manual?

Questions and answers

Summary of Contents for Swegon ADRIATIC VFc

  • Page 1 ADRIATIC VFc Installation – Commissioning – Maintenance Installation L < 19.7" L < 19.7" + 4 x...
  • Page 2: Water Connections

    Cu Ø12 x 1 mm   20-35 Nm Max. recommended operating pressure: 230 psi Max. permissible inlet flow temperature: 140°F Note that clamp ring couplings require support sleeves inside the pipes. Swegon reserves the right to alter specifications. 14-09-2016...
  • Page 3 23.6" (1side) 9 0 ° 9 0 ° 2 3 . 6 + 1 1 .8 - I= 1 1 .8 2 3 . 6 1 . 8 - O H = 1 14-09-2016 Swegon reserves the right to alter specifications...
  • Page 4 176.7 4L2M 4L2M 0.12-0.28 79.5- 229.9 3M3H 3.9-I  0.12-0.28 69.9-107.0 202.2 3L3M 3L3M 0.12-0.28 85.8- 248.3 0.12-0.28 83.7- 239.0 3LM2H 3LM2H 0.12-0.28 92.2- 264.4 2L2M2H 2L2M2H 0.12-0.28 100.6- 289.8 L3M2H L3M2H Swegon reserves the right to alter specifications. 14-09-2016...
  • Page 5 ADRIATIC VFc Maintenance 14-09-2016 Swegon reserves the right to alter specifications...
  • Page 6 ADRIATIC VFc ( C l i c k ( C l i c k ( C l i c k ( C l i c k Swegon reserves the right to alter specifications. 14-09-2016...

Table of Contents