Download Print this page

GE PACE 1000 Safety Instructions And User Manual page 10

Pressure automated calibration equipment, pressure indicators

Advertisement

4.9 Hydraulic connections
Connection
Input
Reference
Note: Pressure connections greater than 210 bar are 9/16" 18UNF Male Autoclave.
1. Switch off the power supply before connecting or disconnecting the instrument.
2. Use the applicable sealing method for all pressure connections.
3. Isolate the hydraulic pressures and de-pressurise the pipes before connecting or
disconnecting the instrument.
4.10 Pressure input (Figure 2)
1. Make sure the user systems can be isolated and vented.
2. Use the applicable sealing method for all pressure connections.
3. The hydraulic liquid must be clean, refer to specification given in the data sheet.
4. Connect the Unit Under Test (UUT) to the appropriate connection port.
5. Fill and bleed the UUT and connecting pipes.
5 Mounting kits
5.1 Rack-mount option (Figure 5)
There must be enough space at the rear of the instrument for all the cables and pipes. The length
of the cables and pipes must allow for the removal and installation of the instrument. The cooling
air of the instrument must not be obstructed. Allow a free flow of air through the equipment rack
and around the instrument, especially at high ambient temperatures.
ISO228/1 G 1/8 parallel threads (DIN ISO228/1, JIS B0202)
ISO228/1 G 1/8 parallel threads (DIN ISO228/1, JIS B0202)
Figure 5 Rack-mounting
10
K0467 Issue No. 4

Advertisement

loading