Download Print this page
Zenner IUW Series Installation And Operating Instructions Manual

Zenner IUW Series Installation And Operating Instructions Manual

Ultrasonic bulk water meter

Advertisement

Available languages

Available languages

Quick Links

IUW
DE
Installations- und Bedienungsanleitung
Ultraschall-Großwasserzähler
GB
Installation and operating instructions
Ultrasonic bulk water meter

Advertisement

loading

Summary of Contents for Zenner IUW Series

  • Page 1 Installations- und Bedienungsanleitung Ultraschall-Großwasserzähler Installation and operating instructions Ultrasonic bulk water meter...
  • Page 2 Deutsch Produktbeschreibung Aktivierung des Messgerätes Ultraschall Großwasserzähler Typ IUW für Kalt- Das Display des Messgerätes befindet sich bei ■ wasser bis 50 °C Auslieferung im „sleep mode“. Die Aktivierung Ultraschall Großwasserzähler Typ IUWN mit des Displays erfolgt zehn Sekunden nachdem das ■...
  • Page 3 Absperrorgane vor und hinter dem Messgerät Die Konformitätserklärung ist im Lieferumfang ■ schließen und die Einbaustelle druckentlasten. enthalten. Diese, und die neuesten Informationen Vorhandenes Messgerät oder Passstück demon- zum Produkt können auch unter www.zenner.de ■ tieren. abgerufen werden.
  • Page 4 Deutsch Menüanzeige: Segmenttest / Firmware-Version: Mit einem NFC fähigen Endgerät, können folgende Der Segmenttest wird alle 5 Min. ausgeführt (3 Sek. (nicht editierbaren) Menüanzeigen aufgerufen an / 3 Sek. aus) danach wird die Firmware-Version werden. Dazu das NFC Endgerät in die Nähe der für 3 Sek.
  • Page 5 Durchmesser Lockreis Stück Anzahl Schrauben Schraubengröße Schraubenloch Durchmesser 10,8 13,5 Gewicht ca. Abmessungen IUW ZENNER International GmbH & Co. KG Römerstadt 6 | 66121 Saarbrücken | Germany Telefon +49 681 99 676-30 E-Mail info@zenner.com Telefax +49 681 99 676-3100 Internet...
  • Page 6 Suitable measures must be taken to ensure that ■ any contamination or damage is excluded during transport to the installation location. The IUW series has been approved with a flow ■ sensitivity class U0/D0 (no inlet or outlet section required). However, to achieve the best measure- ment results, we recommend observing national regulations and recognised rules of technology.
  • Page 7 The declaration of conformity is included in the Prior to installing the measuring instrument, the delivery. The latest information on this product can ■ be called up from www.zenner.com pipe system is to be carefully flushed. Close the valves upstream and downstream of the ■...
  • Page 8: Menu Display

    English Menu display: Segment test / Firmware version: With an NFC-enabled device, the following (non- The segment test will be carried out every editable) menu displays can be called up. Bring the 5 minutes (3 seconds on / 3 seconds off), after then NFC device close to the NFC interface and remove the firmware version is displayed for 3 seconds.
  • Page 9 Number of bolts Screw size Screw hole diameter 10.8 13.5 Weight approx. Dimensions IUW ZENNER International GmbH & Co. KG Römerstadt 6 | 66121 Saarbrücken | Germany Phone +49 681 99 676-30 E-Mail info@zenner.com +49 681 99 676-3100 Internet...
  • Page 10 Notice...
  • Page 12 ZENNER International GmbH & Co. KG Römerstadt 6 66121 Saarbrücken Germany +49 681 99 676-30 Telefon +49 681 99 676-3100 Telefax info@zenner.com E-Mail www.zenner.de / www.zenner.com Internet...