Page 1
TB-CHRG Installation Instructions 244 Bergen Boulevard, Woodland Park, NJ 07424, Phone: 973.785.4347 - Fax: 973.785.4207 3/8 MIN - 5/8 MAX R. 1. DETERMINE LOCATION AND CUT 6-1/16 x 5-3/16 HOLE WITH 3/8 MIN - 5/8 MAX RADIUS CORNERS IN TABLE TOP.
Page 2
BEFORE TIGHTENING CABLE TIES, DO THE FOLLOWING: 1. Ensure loop for the A/C cord does not touch any edge when in the open position. 2. Test cycle the unit to ensure AC cord make contact with any edges or components inside the box. Shown with lid closed.
Need help?
Do you have a question about the TB-CHRG and is the answer not in the manual?
Questions and answers