Installing The Fronius Symo Hybrid With The External Battery; Tips Before Commissioning; Commissioning; Maximum Clearances Between The Components - Fronius Symo Hybrid Monitoring Manual

With external battery
Table of Contents

Advertisement

Installing the Fronius Symo Hybrid with the external
battery
Tips before com-
It can take up to two hours to update the inverter. During this time the inverter must be con-
missioning
nected to an AC power source. To save time during installation, work may still be carried
out in a non-live area of the system while the update is in progress.
More information on the update process can be found under
Fronius system

Commissioning

IMPORTANT!
Failure to follow these steps in the correct order will not only invalidate the warranty,
but also risks a deep discharge of the battery.
IMPORTANT!
If the installation cannot be completed in one attempt, precautions must be taken to
prevent a deep discharge of the battery (see the battery Installation Instructions).
Observe the enclosed complete circuit diagram for the entire system during commission-
ing.
Set up the entire system in the following order:
1.
2.
3.
4.
5.
6.
Maximum clear-
ances between
the components
monitoring" on page
Install the inverter (Fronius Hybrid series)
Install the Fronius Smart Meter
Install the Fronius Checkbox and external battery
(for more information on installing the Fronius Checkbox, see section
Fronius Checkbox
on page 9)
Launch and complete the Setup wizard (wizard on the inverter)
Configure communication between the battery and the inverter
Carry out a function test
max. 1 m
"Software version of the
14
max. 9 m
Installing the
7