Kersten UBS Hydro II Translation Of The Original Instructions page 26

Table of Contents

Advertisement

UBS Hydro II
Transport, Packaging and storage
2018-05-02
Fig. 4: Transport of the machine
1
Anchor points
For the transport of the machine use the provided lifting eyes (1) of the one-axle
tractor and the existing attachments. Only use functional lifting tackle in safety-
related good order and condition and with sufficient load capacity.
Observe the following steps when transporting the machine:
1.
Without attachment, extend the parking support.
2.
If installed, actuate the locking brake, so that the driving wheels are blocked.
3.
Switch the engine off and close the fuel tap.
4.
Fix the lifting tackle to the lifting points of the one-axle tractor and the
attachments.
5.
Pre-stress the lifting tackle and check it for correct seat and load distribution.
6.
Tension the machine.
26 / 60
EN

Advertisement

Table of Contents
loading

Table of Contents