1. Commissioning
- According to DIN EN 50110-1, only qualified electricians may carry out the installation and
commissioning of the ventilation control unit and connected accessories.
- Observe all regulations stipulated by your local power supply utility and all VDE or local regulations.
- DIN VDE 0100 Regulations regarding the installation of high voltage systems up to 1000 V
- DIN VDE 0105-100 Operation of electrical plants
- Only original Wolf accessories may be used (electric heater coils, condensate pump, servomotors,
etc.), otherwise, the Wolf warranty will be void.
For Austria, the ÖVE regulations and local building regulations apply.
1.1. Connecting the power cable
Repair switch
Control panel
1.2. Switching ON the ON/OFF switch on the control panel
1.3. Displays and controls on the BML
L.h. rotary
selector
Info key
Temperature
adjustment
2
Commissioning
Status display
Room
temperature
Zone 1
20.0 °C
Friday
31/10/08
12 : 16
Time alternating
with outside temperature
Route the power cable attached
to the bottom of the unit securely
and wire it to a terminal box on
site.
Power cable, external: 3 x
2.5mm². On-site fuse/MCB
protection: 230 V/16 A
Display
R.h. rotary
selector
Minimum fresh air
proportion (no function)
Speed adjustment
3063528_201308