Cisco Catalyst 6500 Series Installation Note page 13

Switch content switching module
Hide thumbs Also See for Catalyst 6500 Series:
Table of Contents

Advertisement

Figure 3
Using the thumb and forefinger of each hand, grasp the two ejector levers and press down to create
c.
a small (0.040 inch [1 mm]) gap between the module's EMI gasket and the module above it. (See
Figure
Pressing down too firmly on the levers will bend and damage them.
Caution
While pressing down, simultaneously close the left and right ejector levers to fully seat the
d.
supervisor engine or module in the backplane connector. The ejector levers are fully closed when
they are flush with the module faceplate. (See
78-15751-01
Clearing the EMI Gasket in a Horizontal Slot Chassis
WS-X6K-SU P2-2GE
1
CONSOLE
PORT
MODE
CONSOLE
SUPERVIS OR2
WS-X6K-SU P2-2GE
2
CONSOLE
PORT
MODE
CONSOLE
SUPERVIS OR2
3
Press down
4
WS-X622 4
5
24 PORT 100FX
6
3
4
4
WS -C6 500 -SF
M
5
5
SW ITC H FAB IRD
MD L
6
6
3.)
Catalyst 6500 Series Switch Content Switching Module Installation Note
Switch
Load
100%
PORT 1
PCMCIA
EJECT
1%
Switch
Load
100%
PORT 1
PCMCIA
EJECT
1%
1 mm
Gap between the module
EMI gasket and the
module above it
Figure
4.)
Installing the CSM
PORT 2
PORT 2
Press down
13

Advertisement

Table of Contents
loading

Table of Contents