Download Print this page

baxiroca G 1000-11 Installation, Assembly, And Operation Instructions For The Installer page 49

Advertisement

Available languages

Available languages

Remove the top rear panel.
7
A
Remove the smoke box cover.
B
Insert the cleaning brush between
the fins vertically, i.e. in the direction of
the flues.
Replace the smoke box cover and check
it for tightness.
Refit the top panel.
Once these operations (removing the
burner and cleaning) have been
completed:
-
Check the gas circuit for leaks and
correct operation (ignition, pilot
flame, controls).
-
Carry out a general check of the
boiler (fixing, leak tightness, correct
operation of the gas train and
thermostats).
7
A
B
49

Advertisement

loading

This manual is also suitable for:

G 1000-17G 1000-14G 1000-20G 1000-22