Bluerock Tools 12"Z1/LRB/TS Operational Manual

Core drilling machine with tilting stand/large rolling base

Advertisement

Quick Links

Volume
1.3
OPERATIONAL MANUAL
MODEL: 12"Z1/LRB/TS CORE DRILLING MACHINE
WITH TILTING STAND / LARGE ROLLING BASE
\
by BLUEROCK ® Tools

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 12"Z1/LRB/TS and is the answer not in the manual?

Questions and answers

Summary of Contents for Bluerock Tools 12"Z1/LRB/TS

  • Page 1 Volume OPERATIONAL MANUAL MODEL: 12”Z1/LRB/TS CORE DRILLING MACHINE WITH TILTING STAND / LARGE ROLLING BASE by BLUEROCK ® Tools...
  • Page 2 1 2 ” Z 1 L R B / T S C O R E D R I L L UNPACKING THE ITEM CAUTION: This machine is packed together with items that may be sharp, oily and overly heavy objects. Remove the machine from the packaging in a safe manner. Check to ensure all accessories are included with the item while unpacking.
  • Page 3: Table Of Contents

    1 2 ” Z 1 L R B / T S C O R E D R I L L Table of Contents SAFETY PRE-OPERATIONAL SAFETY CHECKS OPERATIONAL SAFETY CHECKS HEALTH WARNINGS SPECIFICATIONS INCLUDED ACCESSORIES ADDITIONAL AVAILABLE ACCESSORIES BLUEROCK ® T DDITIONAL ACCESSORIES FOR THIS MACHINE CAN BE FOUND IN OOLS ONLINE SHOP AT BLUEROCKTOOLS COM OR FROM YOUR LOCAL RETAILER...
  • Page 4: Safety

    Chapter 1 2 ” Z 1 L R B / T S C O R E D R I L L Safety DO NOT USE THIS MACHINE UNLESS YOU HAVE READ THE OPERATING INSTRUCTIONS! Safety glasses must be worn at all times Long and loose hair must be in work areas.
  • Page 5: Health Warnings

    1 2 ” Z 1 L R B / T S C O R E D R I L L Ø DO unplug machine while changing or adjusting cutting bits so as not to accidentally turn machine on. Ø DO remove adjusting wrenches prior to turning the machine on. Ø...
  • Page 6 1 2 ” Z 1 L R B / T S C O R E D R I L L Crystalline silica from bricks, cement and assorted masonry products. § TO REDUCE RISK OF EXPOSURE TO THESE CHEMICALS, WORK IN A WELL VENTILATED AREA WITH VACUUM SYSTEMS, RESPIRATORS AND WITH ALL SUITABLE SAFETY EQUIPMENT.
  • Page 7: Specifications

    1 2 ” Z 1 L R B / T S C O R E D R I L L Chapter Specifications ELECTRICAL DATA Voltage 110V, 50-60Hz, Single Phase Current 21.6 Amps (30A Circuit Use Recommended) Motor Size 2600W Power Connection US Standard 3 Prong Type B Plug MECHANICAL DATA Cutter Range...
  • Page 8: Additional Available Accessories

    1 2 ” Z 1 L R B / T S C O R E D R I L L Note UPON RECEIPT, CHECK CAREFULLY TO ENSURE THAT THE MACHINE IS IN GOOD CONDITION AND HAS ALL ACCESSORIES LISTED ABOVE. Additional Available Accessories Additional accessories for this machine can be found in BLUEROCK ®...
  • Page 9: Operations

    1 2 ” Z 1 L R B / T S C O R E D R I L L Chapter Operations Note THOROUGHLY READ THROUGH THE ENTIRE MANUAL BEFORE OPERATING THIS MACHINE! PURPOSE Ø The purpose of the 12”Z1 LRB/TS Core Drill is to drill through masonry, concrete or other mineral rock types using annular coring bits.
  • Page 10: Transporting The Machine

    1 2 ” Z 1 L R B / T S C O R E D R I L L Ø This machine has one primary adjusting point for the angle between the drill stand and the drill motor. The angle Adjusting bolt (12 below) can be loosened to adjust the angle and retightened when desired angle is achieved.
  • Page 11: Running The Machine

    1 2 ” Z 1 L R B / T S C O R E D R I L L RUNNING THE MACHINE Ø Do all pre-operational and operational safety checks from Chapter 1. Ø Consider your security and stability as well as the orientation of the machine in the work area. Consider the work surface material, condition, strength, density and rigidity.
  • Page 12: Installing Coring Bits

    1 2 ” Z 1 L R B / T S C O R E D R I L L Ø Open the water valve to allow water to come out to the work surface. Ø ATTENTION: BE AWARE THESE MACHINES ARE EXTREMELY POWERFUL. THEY HAVE A TREMENDOUS AMOUNT OF TORQUE, WHICH MIGHT NOT BE SUITABLE FOR ALL POTENTIAL USERS.
  • Page 13: Troubleshooting

    1 2 ” Z 1 L R B / T S C O R E D R I L L Chapter Troubleshooting Note SERVICING SHOULD ONLY BE DONE BY A QUALIFIED TECHNICIAN. DON’T FORGET TO UNPLUG POWER TO UNIT PRIOR TO SERVICE! PROBLEM SOLUTION Motor does not turn on.
  • Page 14: General Maintenance

    1 2 ” Z 1 L R B / T S C O R E D R I L L Chapter General Maintenance Ø Inspect electrical cords and electrical connections. Ø Keep machine clean and free of debris. Ø Check for misalignment, binding and breakage of all moving parts. If damaged, repair tool before use. Ø...
  • Page 15 1 2 ” Z 1 L R B / T S C O R E D R I L L Make certain the spindle is facing the ground so as not to get oil/grease everywhere. Locate the hex screws holding the gear housing together and remove them.
  • Page 16: Parts List - Motor And Gearbox

    1 2 ” Z 1 L R B / T S C O R E D R I L L Chapter Parts List – Motor and Gearbox Name Name Name Spring ring for holes Shaft sleeve Brush assembly Washer Hex nut Brush holder Rubber sealing 42x55x8 Needle bearing BK1816...
  • Page 17: Breakdown View - Motor

    1 2 ” Z 1 L R B / T S C O R E D R I L L Breakdown View – Motor...
  • Page 18: Breakdown View - Gearbox

    1 2 ” Z 1 L R B / T S C O R E D R I L L Breakdown View – Gearbox...
  • Page 19: Parts List - Tilting Stand

    1 2 ” Z 1 L R B / T S C O R E D R I L L Parts List – Tilting Stand 1 Handle ball 26 Hexagonal bolt 2 Operating stick for machine 27 Clamping washer 3 Lengthen sleeve 28 Supporting board 4 Clutch pin 29 Inner hexagonal oval screw...
  • Page 20: Breakdown View - Drilling Stand

    1 2 ” Z 1 L R B / T S C O R E D R I L L Breakdown View – Drilling Stand...

Table of Contents