Download Print this page

Honeywell XPO Series Manual page 6

Low temperature burner for use with clean fuel gases

Advertisement

IV. Burner mounting instructions 燃燒器安裝指導
 
FLANGE THE BURNER TO THE INSTALLATION
 
Bolt the burner to the installation's burner mounting flange. Use proper gasketing. Tighten the flange bolting with correct
torque. Retighten all bolts after first firing and regularly after commissioning.
 
 
All non-liquid cooled surfaces must be insulated as shown in burner mounting diagram. Area(s) between fire tube wall and
outside of burner blast tube must be completely filled with insulation as shown below. Customer-supplied scanner tube must
not extend beyond the blast tube insulation.
*Recommended insulation properties: minimum density of 16 kg/m
W/m.K at 980°C.
 
 
 
 
 
 
 
1) XPO ™ burner
XPO ™ 燃燒器
2) Mounting flange 固定法蘭
3) Unit wall 單元牆
4) Liquid solution 液體溶液
5) Fire tube 煙管
6) Burner blast tube 燃燒器排氣管
7) Non-cooled fire tube wall 非冷卻煙管壁
8) Customer-supplied insulation*
*All non-liquid cooled surfaces must be insulated as shown above.
*
所有非液體冷卻面必須按如圖所示方式進行隔熱
 
 
 
 
 
 
 
 
Blast tube is completely insulated beyond point
 
where fire tube is solution backed. Minimum of 3"
 
 
 
1) Blast tube
 
2) Liquid solution
 
3) Fire tube
4) 152 mm gap required
from insulation to
slots
5) Customer-supplied
scanner tube
6) Customer-supplied
insulation (minimum
 
152 mm depth from
blast tube flange) *
 
客戶提供的 隔熱材料*
Correct installation
insulation into liquid.
6
 
4
 
3
5
2
6
3
or greater with minimum thermal conductivity of 12
Incorrect application/installation
Blast tube cannot be completely insulated due to
protrusion length of fire tube out of solution.
 
 
 
 
6
 
 
 
 
 
 
1
5
3
4
1
2
08092018

Advertisement

loading