Technical Information; Installation - AQUALUX 103458 Manual

Filtration unit
Table of Contents

Advertisement

Available languages

Available languages

Ref
Pool Volume (m
103458
23 - 40
103460
36 - 60
105799
36 - 60
103461
45 - 80
103463
55 - 95
* : for given flow rates from 50 m
Maximum operating pressure: : 2 bars
- It is imperative to verify the non-closure of suction holes.
- It is advisable to turn off the filter during maintenance of the filtration system.
- Regularly monitor the level of filter clogging.
- Deny access to the pool in case of damage or filtration systems
THE PACKAGE CONSISTS OF:
-1 Sand filter
-1 Prewired Filtration Pump
-1 Base Pump
-1 Multi-way valve + flanges + gasket
-1 Accessories bag
THE DECK IS INSTALLED:
- More than 3.50 m from the edge of the pool
- In a sheltered from rain and easy to access
- On a flat surface, below the water level
Make sure the 8 laterals are correctly clipped into their holes (fig.1, n°8).
HANDLING STRAINERS
Press gently and simultaneously the 2 buttons (No. 1) on either side of the screen, lift it out. Do the reverse for the
establishment.
Every manipulation of the screen, make sure it is properly clipped, folded outwards and secured to the collector.
• Obstruct temporarily the top hose (fig. 1, n°9) in order to avoid filling it
with sand.
• Installation of the filtering charge :
- Fulfil the tank (fig.1, n°1) with 1/3 water in order to protect the laterals
when the filtering charge falls down.
- Pour the quantity of filtering charge needed, according to your filter's
capacity (cf table page 1). The filtering charge should not exceed 2/3 of
the tank's height.
- CAUTION : be sure that the central hose (fig.1, n°9) is in the axis of the upper opening. Pour with care the
first bag of the filtering charge in order to keep the central hose in the axis.
- Check the position of the central hose (vertical).
- Once the tank is full, clean the surround of the filter's upper opening.
- Open the central hose and make a global visual check-up (stability, positioning...)
• SETTING OF THE VALVE :
- Put the o'ring under the valve (fig.1, n°3).
- It is advisable to put a bit of silicon oil on the o'rings.
- Position the valve so that the 'RETURN' outlets (discharge, fig.1, letter S) and 'PUMP' (suction, fig.1, letter E)
are directed towards the pump, in order to facilitate the connection of the linking hose (fig.2).
- Put the two half-flanges (fig.1, n°5) on each side of the valve and be careful to put 'nut prints' on the
opposite side. Make sure to insert the valve and filter flanges in the flange.
- Insert the screws (fig.1, n°6) and nuts (fig.1, n°7) according to the scheme with a Phillips screwdriver.

TECHNICAL INFORMATION

Flow rate
3
)**
(m
/h)*
3
5
8
8
10
12
/h/m
- ** : Recycling time : 4h30
3
2
(IF NECESSARY)
Diameter filter
Filtering area
(mm)
(m²)
365
0,10
515
0,20
515
0,20
515
0,20
615
0,28
I. INSTALLATION
TOOLS REQUIRED:
-1 Phillips screwdriver pH12
- 2 Keys (flat or mixed) # 13
II. SETTING
6 | NOTPSB-INDG-0117
Pump
Sand quantity
power
1/4CV - 180W
1/25CV - 300W
1/25CV - 300W
1/2CV - 370W
0,8CV - 600W
(kg)
40
100
100
100
150

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

103460105799103463103461

Table of Contents