Disassembly And Reassembly Of Major Components; Engine Disassembly; Oil Level Gauge - Doosan PU158TI Operation & Maintenance Manual

Generator diesel engine, power unit diesel engine
Table of Contents

Advertisement

3. Disassembly and Reassembly of Major Components

3.1. Engine Disassembly

Engine part's disassembly procedures are as follows;
For the various tool storage before disassembly and parts storage after disassembly, the shelf for
parts is prepared.
At the time of disassembly and reassembly, do the work with the naked and clean hand, and also the
working place must be maintained clean.
The torn parts after disassembly must be kept not to collide each other.
In disassembling, torn parts should be laid in disassembled order.

3.1.1. Oil level gauge

Take out the oil level gauge
3.1.2. Engine oil
Remove an oil drain cock from the oil pan, and let engine oil discharge into the prepared vessel.
3.1.3. Cooling water
Remove the cooling water drain plug from the cylinder block and oil cooler, various pipes, etc. and let
the cooling water discharge into the prepared vessel.
3.1.4. Cooling fan
Remove fan fixing bolts, then take off the
cooling fan.
3.1.5. V-belt
Loosen the V-belt tension adjusting
bolts, and remove the V-belt.
Engine Disassembly
- 52 -
EPM2001I
EFM2002I

Advertisement

Table of Contents
loading

Table of Contents