Download Print this page

ABB LST300 Series Description With Wiring Suggestions page 4

Hide thumbs Also See for LST300 Series:

Advertisement

Wiring
Follow the following steps to connect the
transmitter:
1. Remove the cover on one of the two electrical
connection ports on the upper sides of the
transmitter housing.
2. Install various adapters and bushings on the
inch NPT internal threads of connection ports, if
necessary, to conform to factory wiring (conduit)
standards.
3. Remove the cover on the side of the field
terminal.
For explosion-proof/fire-proof installation, the
transmitter cover shall not be removed when the
power supply is connected to the device.
4. Pass the cable through the open port. Connect
the positive lead to the'+'terminal and the
negative lead to the'-' terminal.
Do not connect the power
supply to the test terminal,
Attention
otherwise the test diode in
-
Important
the test connection will be
Matters
damaged.
5. Block and seal electrical ports. Seal these
openings after installation to prevent rainwater
and corrosive steam and gas from entering the
interior.
6. Install wiring with dripping ring whenever
possible. When installing the drip ring, the
bottom should be lower than the conductor pipe
connector and the transmitter housing.
7. Rotate after installing the cover, so that the O-
ring is loaded into the shell, and then continue to
tighten manually until the metal part of the cover
contacts with the metal part of the shell.

Advertisement

loading