Pre-Installation - Kruger ALTO-H User Manual

Table of Contents

Advertisement

CHARACTERISTICS
Dimensions
14 1/4"
INSTALLATION
NOTE: Installation will require 2 people for easier installation. Please read all instructions carefully before installing.

Pre-Installation

1.
If you are renovating your kitchen, be careful to protect your range hood.
Volatile gases from building materials, dust, paint and coatings can
corrode and tarnish the surface of your range hood. Instead, install
your range hood after your kitchen renovation is complete.
2.
The stainless steel may have very sharp edges; wear protective
gloves when removing the range hood for installing, cleaning or servicing.
3.
Be careful not to damage any hidden electrical wiring when drilling
into a wall. Unplug the range hood from the power source before
installation; the main power box or fuse box should also be switched off.
4.
If the gas stove needs to be removed before installing the range
hood, make sure to switch off the gas valve completely before
moving the gas stove.
5.
Always use a power socket with reliable grounding. Compromised
power line, extension cords and multi-port wiring devices may lead
to electric shorts, causing plugs and sockets to overheat and become
re hazards.
6.
Make sure all electrical connection is done by professional electricians,
and strictly abide by national and local electric laws and regulations.
Switch the power off and take measures to prevent the power switch
from accidentally switching on before proceeding.
7.
After installation, test run the unit to make sure there is no abnormal
operation or malfunction. Read the instruction manual carefully and
keep it in a safe place.
12"
30" or 36"
3
17"
2 3/4"
24"

Advertisement

Table of Contents
loading

Table of Contents