IntelliVue Arm Assembly Instructions
Method a
step 1
Preparing wall for track mounting.
The four anchorage methods illustrated
in the next few pages represent load tests
made to comply with California OSHPD
requirements for the anchorage and
installation of instrument support system.
OSHPD requires that such support
systems resist a lateral force of 2 times
the weight of the instrument and a vertical
force of 2.2 times that weight applied
simultaneously.
For 5/8" Gypsum Board walls to comply
with CA seismic requirements for wall
mounted instrumentation. CA OSHPD
Anchorage pre-approval number TBA.
Anchorage or support of metal stud wall
must be verified by the project engineer
and approved by OSHPD prior to the
installation of any mounting system.
the maximum load rating for this
system is 80 lbs/36 kg or 110 lbs/50 kg.