ABB ZX0 Manual For Installation And Operation page 18

Gas-insulated medium voltage switchgear
Hide thumbs Also See for ZX0:
Table of Contents

Advertisement

- Earth the completely assembled frame. Further details on
this can be found in the order documents.
?
When applying the floor topping, carefully fill under
the foundation frame with topping material.
Fig. 2.2.1.1: Installation of the floor frame
1
7
1
18 | Manual ZX0 HB 600 en - Revision 05
1
2
Section A-A
Floor topping
A
A
Top of finished floor
1
2
3
4
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents