Download Print this page

Planet NOVASwitch Series Quick Installation Manual page 4

10/100mbps switch

Advertisement

Part
Two: Installation
Installation
1. Cabling Guidelines
♦ Maximum length of a multi-mode fiber cable (62.5/
125µm) is:
2 kilometers (6560 feet) for full-duplex, or
412 meters (1351 feet) for half-duplex 100Base-FX
after module installed
2. Power off the FNSW-800 and remove the unit from the 19-
inch rack.
3. Release the two screws to remove the module cover. Make
sure the last port (port#8) is free
4. Slide in the module follows the chutes firmly. Secure the two
screws.
5. Put back the switch.
6. Make the connection follow the cabling guidelines above.
Note, please check the mode (Full/Half-Duplex) of the
device that is going to attached to and set the DIP switch.
7. Power on the unit and the connected devices, the LED
indicators of port#8 will blink follow the user's guide of
FNSW-800, section "LED Indications".
Extension Slot
3
Ha lf-Duplex
Full-Duplex

Advertisement

loading

This manual is also suitable for:

Novaswitch fnsw-001scNovaswitch fnsw-800Novaswitch fnsw-001st