Hidraulic Connections - Riello BAG2 MIX CLIMA Instructions For The Installer And The Technical Assistance Service

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 13
HYDRAULIC CONNECTIONS
HYDRAULIC CONNECTIONS
HYDRAULIC CONNECTIONS
HYDRAULIC CONNECTIONS
HYDRAULIC CONNECTIONS
Before forming the connections all the piping must be
thoroughly flushes to remove any residue that could com-
promise the proper functioning of the
The plumbing connections to the boiler and the system
must be carried out rationally, as indicated in the figure.
Direct connections can be formed using the female cou-
plings on the delivery and return pipes for the
MIX CLIMA
, or taps (not supplied) can be fitted on the
lines for shutting off the lines.
These taps are very useful when maintenance is carried
BAG
out, as they allow the
without having to drain the entire system.
Check that the expansion vessel on the boiler
has sufficient capacity for the size of the system.
20
INSTALLATOR
2
BAG
MIX CLIMA.
BAG
2
MIX CLIMA
to be drained
2
TA2
ambient
thermostat
TA1
ambient
thermostat
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
TA
1 2 3
1 2 3
boiler
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
Low temperature
1 2 3
1 2 3
system (mixed)
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
High
1 2 3
1 2 3
temperat.
1 2 3
system
1 2 3
1 2 3
230 V~
50 Hz
SE
External
sensor
(optional)

Advertisement

Table of Contents
loading

Table of Contents