Download Print this page

Sealey AP2020BB Instructions page 4

Heavy-duty workbench with 2 drawers ball bearing runners

Advertisement

6 6
STEP 6. Slide the workbench top (P) under the main unit and fix
with 4 hex head screws (U).
8
STEP 8. Pull the middle slide and the ball bearings out as far as possible. Hold the drawer and slot the inner slide on the drawer into the middle slide,
then push the drawer all the way in.
To remove drawer see Step 2.
7
STEP 7. Attach the inner slide onto the drawer. Slot the
horizontal tab into the hole in the drawer and the vertical
tab into the other hole. Push down until the stop slots
into the small hole.
AP2020BB - 1 - 260407

Advertisement

loading