Download Print this page

Sealey AP2020BB Instructions page 2

Heavy-duty workbench with 2 drawers ball bearing runners

Advertisement

3.
ASSEMBLY
1
Step 1. As shown in the diagram attach the two large side panels (A), bottom rail (C) and centre support (E) together.
2
Ball bearing runner disassembly: Press the plastic lock spring up or down, and pull the inner
slide out. To put the runners back on, slot the inner slide into the middle slide and push all the
way in.
STEP 2. Attach the outer slide to the corresponding left/right slide panel (G, H). Insert the tabs into the holes in the slide panel making sure that
the slider stop fits into the small hole.
AP2020BB - 1 - 260407

Advertisement

loading