L-Acoustics Kara Owner's Manual page 70

Hide thumbs Also See for Kara:
Table of Contents

Advertisement

Rigging procedures
2. (Optional, see
M-BUMP rigging options
each M-BAR):
a) Remove both T-BLP from the M-BAR.
b) Insert both M-BAR studs face to the desired M-BUMP holes.
c) Secure by inserting both preceding T-BLP through M-BAR studs and M-BUMP holes.
In case of SB18 standalone array rigging, the M-BAR is not useful unless it is intended to modify the distance
between the rigging points (see
3. Attach the shackle(s) to the M-BUMP (see
desired conguration (see
4. Build a stack composed of two SB18 (hereafter called SB18#1 and SB18#2) at the rigging location as follows:
a) Place two SB18 at the rigging location and remove the dolly boards.
b) Put SB18#1 onto SB18#2 so that the front grills are facing the audience and the logos are placed at the bottom.
c) Attach the four rigging arms of SB18#2 to SB18#1 as follows: disconnect a T-BLP from SB18#2, rotate the
rigging arm up, re-connect the T-BLP to the SB18#1 rigging point and the rigging arm ; repeat this procedure
until all 4 arms are secured.
70
(p.189)) Install one or two M-BAR on the M-BUMP as follows (repeat for
M-BUMP rigging options
c.
APPENDIX D: Safety pin removal and insertion
M-BUMP rigging options
(p.189)).
(p.189)).
b.
Kara owner's manual (EN) version 1.0
(p.199)) according to the

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

La4xSb18La12xLa8La-rakLa-rak ii ... Show all

Table of Contents