3.3
Lubrication
Precaution
When set-up a new
machine or a machine
after an extended
period of disuse, run
your machine at
3,000 - 3,500 rpm
for about 10 minutes
for the purpose
of break-in.
Before turning the machine on,
fill oil reservoir '1' with sewing
machine oil up to 'HIGH' mark 'A'
(Figure 6).
When the oil level lowers below
'LOW' mark 'B', refill the oil reser-
voir with the specified oil.
Integrated Energy Saving Direct Drive Motor Lockstitch Sewing Machine
A
B
1
Figure 6
When you operate the machine af-
ter lubrication, you will see splash-
ing oil through oil sight window '2'
if the lubrication is adequate.
Note that the amount of the splash-
ing oil is unrelated to the amount
of the lubricating oil.
HIGH
LOW
|
Instruction Manual and Parts List
2
7