GAS AND ELECTRICAL HOOK-UP
With the unit inside of the enclosure, connect the
gas supply hose to the manual shut-off valve and
open valve. Check the connection points at the shut-
off valve for any leaks and repair prior to installation
of the unit. Connect the power supply cord to the
electrical supply outlet.
Check hose
for signs of
abrasions, cracks
or leaks
Figure 12
Bottom of Unit
Leak Test Points
LP Tank
Page 11
Test Leak Points
Figure 13