Standard Termination Panel Breakout Cable Installation - ADC NG3 User Manual

High-density fiber distribution frame system termination, termination/ splice, and vam panels
Hide thumbs Also See for NG3:
Table of Contents

Advertisement

ADCP-90-297 • Issue 7 • July 2006
3.5

Standard Termination Panel Breakout Cable Installation

Use the following procedure to install a connectorized breakout cable in an unterminated
(adapters only) standard termination panel. A conversion kit (NG3-ACCIFCKIT) is required.
Note: This procedure is most efficiently done by two people, with one person at the front
of the panel and the other person at the rear.
1. Break out the cable according to the dimensions provided in
CONNECTORS
Figure 29. Breakout Dimensions for Breakout Cable Routed to Standard Termination Panel
2. Locate the panel where the cable will be installed and position one person at the front of
the panel and another person at the rear.
3. At the front of panel, fully open the hinged drawer (refer to
Caution: Placing a load in excess of 20 pounds onto an open drawer will result in
misalignment or damage to the drawer.
Page 28
© 2006, ADC Telecommunications, Inc.
BREAKOUT LENGTH
65.0 IN. (165.1 CM)
+0.0 IN./-6.0 IN.
(+0.0 CM/-15.2 CM)
Figure
MULTI-FIBER IFC CABLE
2.0 IN.
OUTSIDE DIAMETER
(5.1 CM)
HEATSHRINK
CLAMP
6.0 IN. (15.2 CM)
Subsection
29.
2 MM MAX.
FOR SUBUNITS
21430-A
2.3).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents