Application Planning; Transport; Unpacking And Checking The Delivery Unit - Siemens Simatic Box PC 840 V2 Getting Started

Hide thumbs Also See for Simatic Box PC 840 V2:
Table of Contents

Advertisement

Application planning

3.1

Transport

3.1
Despite the device's rugged design, its internal components are sensitive to severe
vibrations or shock. You must therefore protect the PC from severe mechanical stress when
transporting it.
You should always use the original packaging for shipping and transporting the device.
Caution
Risk of damage to the device!
When transporting the PC in cold weather, it may be submitted to extreme variations in
temperature. In this situation, ensure that no moisture (condensation) develops on or inside
the device.
If condensation has developed, wait at least 12 hours before you switch on the device.
Notice
When transporting the device, there is a risk that the drive drawer may open and be
damaged or that the drive may be soiled. A piece of Scotch tape serves as transport
safeguard and this should be used for every transportation.
3.2

Unpacking and checking the delivery unit

3.2
Unpacking the device
Note the following points when you unpack the unit
• It is advisable not to dispose of the original packing material. Keep it in case you have to
• Please keep the documentation in a safe place. It is required for initial commissioning and
• Check the delivery unit for any visible transport damage.
• Verify that the shipment contains the complete unit and your separately ordered
SIMATIC Box PC 840 V2
Getting Started, Edition 05/2006, A5E00244266-02
transport the unit again.
is part of the device.
accessories. Please inform your local dealer of any disagreements or transport damages.
3
3-1

Advertisement

Table of Contents
loading

Table of Contents